Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Augenbroe, G, Verheij, H and Schwarzmuller, G (2002) Project web sites with design management extensions. Engineering, Construction and Architectural Management, 9(03), 259–71.

Austin, S A, Baldwin, A N and Steele, J L (2002) Improving building design through integrated planning and control. Engineering, Construction and Architectural Management, 9(03), 249–58.

Ballard, G (2002) Managing work flow on design projects: a case study. Engineering, Construction and Architectural Management, 9(03), 284–91.

  • Type: Journal Article
  • Keywords: design; last planner; production control; value; value generation; work flow
  • ISBN/ISSN: 0969-9988
  • URL: http://www.ingentaconnect.com/content/bsc/ecam/2002/00000009/00000003/art00013
  • Abstract:
    Project management has neglected produc-tion. Its theory and techniques are devoted for the most part to the formation, award and administration of contracts. Production management has equally neglected projects. Developed in manufacturing, theor-ies and techniques of managing production focus almost entirely on the task of making multiple copies of a single design. Management of project-based production systems lies at the intersection of these two disciplines, is enormously important, and has been until recently almost entirely undeveloped. A new project delivery process is emerging in the architectural/engineering/construction (AEC) industry. Its first module is production control, dedicated to the management of work flow between specialists. A new production control system, termed the `Last Planner' system, has been successfully applied both to construction and design phases of AEC projects. The paper presents a case study describing one of the first applications of Last Planner to design, which is considered to be essentially a value generating process.

Heintz, J L (2002) Collaborative design planning networks. Engineering, Construction and Architectural Management, 9(03), 181–91.

Johnson, R, Clayton, M, Xia, G E, Woo, J-H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(03), 241–8.

Lockley, S R, Watson, R and Shaaban, S (2002) Managing e-commerce in construction - revolution or e-business as usual?. Engineering, Construction and Architectural Management, 9(03), 232–40.

Macmillan, S, Steele, J, Kirby, P, Spence, R and Austin, S A (2002) Mapping the design process during the conceptual phase of building projects. Engineering, Construction and Architectural Management, 9(03), 174–80.

Mokhtar, A H M (2002) Coordinating and customizing design information through the internet. Engineering, Construction and Architectural Management, 9(03), 222–31.

Otter, A F d and Prins, M (2002) Architectural design management within the digital design team. Engineering, Construction and Architectural Management, 9(03), 162–73.

Tuzmen, A (2002) A distributed process management system for collaborative building design. Engineering, Construction and Architectural Management, 9(03), 209–21.

Watson, R, Lockley, S R and Shaaban, S (2002) Creating usable models for re-usable data - managing electronic project specification information. Engineering, Construction and Architectural Management, 9(03), 272–83.

Wilde, P D, Augenbroe, G and Voorden, M V D (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(03), 192–208.